C. Dilly Rani* and R. Nagarajan
In this article, a new algorithm for searching Mann-Whitney minimum spanning tree in a critical path network having fermeatean pentagonal fuzzy soft edge length is presented. The proposed algorithm is based on matrix approach to design un-directed fermeatean fuzzy weighted connected graph. Also, we provide numerical example to check the validity of the proposed algorithm using score function and accuracy function.
HTML PDFShare this article
Global Journal of Technology and Optimization received 847 citations as per Google Scholar report