GET THE APP

..

Journal of Textile Science & Engineering

ISSN: 2165-8064

Open Access

Using Critical Path Method for Making Process Layout of a T-Shirt within Earliest Finish Time

Abstract

Takebira UM and Mohibullah ATM*

Apparel business applies different techniques to keep pace with the incremental competition conditions and changing consumer demands. The new design needs new analysis; new manufacturing technique which will take much more time. There is no practice of scientific analysis to manufacturing a new design garment. Critical path method is one of the most effective techniques which is a systematic approach to identifying and reducing manufacturing time through the earliest start time and the earliest finish time and also provides a scientific method for product manufacturing and whole production management. This study was carried out at a men’s T- shirt producer i.e., a ready wear company. The current state of the production lines was analyzed within the scope of the study. Then t-shirt production lines were organized with the CPM techniques. The main strategy of CPM was estimated actual operation time by decreasing traditional manufacturing time. As a result, using of the CPM in garment manufacturing less the lead time of production time as well as the whole manufacturing system gets a new approach and also manufacturer are able to produce the product within minimum possible time and the apparel manufacturer will be able to fabricate contemporary fashion production project.

PDF

Share this article

Google Scholar citation report
Citations: 1008

Journal of Textile Science & Engineering received 1008 citations as per Google Scholar report

Journal of Textile Science & Engineering peer review process verified at publons

Indexed In

 
arrow_upward arrow_upward