Behavior of Structurally Non-connected Settlement Reducing
Piles under Raft Foundation
Author(s): Fekadu Wubetu Melese* and Henok Fikre Gebregziabher
Piles act as a settlement reducer in case of connected piled-raft foundation and hence decrease the settlements of the raft. The design concept of
the connected piled-raft foundations is to lessen the number of piles and utilize the bearing capacity entirely. Due to significant straining actions at
the pile head-raft connection, an alternative technique is proposed to disconnect the piles from the raft. A Granular layer (cushion) beneath the raft
is incorporated. The disconnection has a beneficial effect on reducing axial load compared to connected piles. For small piled rafts, non-connected
piled rafts show less stiffness than connected piled rafts, and the soil is highly stressed and shows greater raft settlement. In the case of the large
piled raft, non-connected piled rafts show greater settlement efficiency. However, as compared to the non-connected piled raft.. Read More»