Detection of Construction Delays on Selected Residential Projects Located Near and Within Metro Manila During Actual Project Execution Using Contemporaneous Method of Measurement
Author(s): Mark Paolo D. Mission*
Construction delays are very common to the industry, and it is very evident in different kinds of construction projects. Even though there are construction guidelines, some companies still fail at some point in their overall cycle, and some consider these failures as norms. Such failures can have a significant impact on project performance. This research paper will analyze the effects of selected factors causing construction delays in residential projects. Contemporaneous method of measurement will determine the effect of each delay in labour hours of a 10-week construction period. The study will then determine the relation between some construction delay factors, and its overall effect in the construction progress. Then, the analysis will discuss the weaknesses of Contemporaneous Method of Measurement. The study will be conducted by means of actual observation data gathering and surv.. Read More»
DOI:
10.37421/2165-784X.2023.13.518
Journal of Civil and Environmental Engineering received 1798 citations as per Google Scholar report